Proper planning for the work can save you hundreds of bucks and immense work hour.
Tile shower curb or floor first.
Install pea gravel or spacers around the drain and weep holes to enable drainage.
At first survey the curb and the tiles you brought to position on that surface.
Measure the top and bottom of the shower wall ours is 82 inches long to make sure it is straight and does not slant in or out.
Use a chicken wire for floating cement over shower curb.
Some showers have grout lines that carry up from the floor over the curb across the shower floor and then up the walls.
A wood 2 4 horizontally to the floor is actually 1 1 2 inches tall.
So what s there in your strategy book.
Others have separate floors walls and curbs.
At first thought from the water leak perspective doing the floor right up to the outer shower curb first wouldn t allow water to seap through the grout at that outer seam.
Mark the curb accordingly.
Let s assume you re a beginner.
Mosaic kitchen tiles mosaic wall tiles ceramic floor tiles ceramic wall tiles wood floor tiles porcelain floor tiles kitchen floor tiles kitchen wall tiles bathroom floor tiles bathroom wall tiles outdoor floor tiles hexagon wall tiles more.
It seems if the tile from the curb came last then water would be stopped a little better.
Ensure the shower floor has a per foot pre slope slope before application of any materials.
Hire a contractor if you have any doubts about your abilities.
Wood shower curb should be fastened to floor and to each other.
And that can t happen if the wall tiles are already installed.
The wall tiles should overlap the floor.
Use a wooden straight edge to level finished cement over shower curb.
In our project we set the tile for the wall opposite the shower door first.
Don t just start putting tiles at random or such stuff.
It include design considerations measur.